Spillover in Agile: 3 Methods to Break an Unfinished Work Behavior


A key agile precept is the worth of getting deliberate work carried out every iteration.

But many agile and Scrum groups fall into the behavior of letting unfinished work spill over dash after dash.

What Is Agile Spillover?

Spillover is when deliberate work (a product backlog merchandise or story) is left unfinished on the finish of the dash or iteration and carries over to a subsequent dash.

Spillover in agile tends to happen for one in every of three causes:

  • Bold dash objective, or
  • An excessive amount of unplanned work, or
  • Underestimating the trouble required to finish the work.

Occasional unfinished work shouldn’t be a nasty factor. Actually, it’s regular and fascinating to often goal just a little excessive in a dash, and are available up quick.

Too many spillovers, nonetheless, can scale back predictability, diminish creativity, hurt morale, and threaten mission timelines.

Commitments Are Not Ensures

Earlier than I get into why spillover occurs and what to do about it, I wish to make this level: a dash objective is a dedication, not a assure. A dedication is a promise to attempt to obtain a objective. If pressured to make a assure, a group will decide to much less in order that the assure is secure.

Generally we do have to make ensures, akin to when a shopper or buyer wants some functionality or a hard and fast scope by a sure date. In these circumstances, to make sure they meet that assure, a mission group would doubtless reduce on different work and set a much less bold dash objective.

Normally, although, we don’t wish to power a group right into a assure. As a substitute, we wish them to decide to one thing affordable, understanding we’ understanding in the event that they miss it.

When Does Story Spillover Develop into a Drawback?

Lacking sometimes shouldn’t be an issue. Routine spillover is totally different.

Agile teams get into trouble when unfinished work becomes a habit.

Routine spillover occurs when agile groups virtually all the time decide to greater than they will full of their sprints. They hardly ever full what they suppose they’ll and finish most sprints with incomplete consumer tales.

With recurring spillover, the tip of the dash turns into an arbitrary date, and unfinished tales are simply carried over into the following dash as if it’s no huge deal.

Influence of Routine Spillover on Agile Groups

Habitually rolling over unfinished tales to the following iteration is an enormous deal for 2 predominant causes: it decreases predictability and negatively impacts morale.

Habitual spillover leads to lack of predictability and lower team morale.

Facet Impact #1: Lack of Predictability

The principle drawback with recurring spillover is an absence of predictability and dependability.

Each group advantages from some stage of predictability. Predictability shouldn’t be the first objective, but it surely needs to be a objective. When your group is predictable, stakeholders will belief you and your work. There can be much less second-guessing and micromanaging, so this belief advantages everybody. However don’t fear: you don’t should be good to be predictable.

It’s the identical in sports activities. Basketball gamers try to make each free throw. However a participant who sinks the ball within the basket about 80% of the time is taken into account a excessive performer. That participant will be trusted to make most of their free throws.

Baseball gamers additionally try to get successful each time they’re at bat. They’re thought-about nice, extremely predictable hitters, in the event that they handle successful about 35% of the time—mirrored of their .350 batting common.

Predictable doesn't mean perfect. 60-80% of the time is good enough.

Like these sports activities gamers, agile groups are anticipated to attempt to ship all the pieces they suppose they will, each time. But when they obtain their objective 60–80% of the time, they’re predictable groups.

Facet Impact #2: Lower in Morale

A second, associated cause groups want to complete what they begin more often than not has to do with the ability of small wins.

In a 2011 research, Amabile and Kramer discovered that tangible, seen progress is a key think about individuals’s enjoyment of labor and stage of creativity.

It’s virtually inconceivable to get this tangible, seen sense of progress on “largely carried out” however unfinished work. One cause is that till a backlog merchandise is totally carried out, you possibly can’t actually gauge the quantity of labor remaining. This is named the 90% syndrome. Software program tasks are usually 90% carried out for 90% of their schedule.

Avoid the 90% syndrome, where software projects are 90% done 90% of the time.

When progress stalls, individuals lose their sense of accomplishment. (Learn this weblog to dive deeper into why it’s so essential for groups to get to carried out.)

Why Does Overcommitment Develop into a Behavior?

So why do some groups routinely attempt to ship extra worth than they will moderately count on to ship? The commonest supply of this unhealthy behavior is strain. That strain can originate from one in every of two locations: exterior or inside.

Exterior strain can come from management, varied stakeholders, or from any exterior supply. An government or stakeholder can exert strain by establishing unrealistic expectations by way of funds or scope.

Generally this management strain is well-intentioned. A frontrunner will get excited in regards to the alternatives offered by a product and desires extra or they wish to produce worth sooner due to the nice it would do the corporate and/or the product’s customers.

Different occasions, although, the strain comes from misguided leaders who suppose strain is an acceptable solution to inspire others. (When this occurs, attempt utilizing the Plan Visualizer software to elucidate why a sure set of labor simply is not potential in a given timeframe.)

The second cause overcommitment occurs is inside: strain from themselves. Some groups permit their optimism and excessive expectations of themselves to create strain to do greater than is cheap.

Both external and internal pressures can lead to a spillover habit.

Whether or not strain to overcommit comes from exterior or inside, it’s neither a wholesome surroundings for group members nor an excellent state of affairs for the group.

Three Methods to Cease Routine Spillover

Bear in mind, we wish to cease recurring spillover, not all spillover. Generally groups miss their targets after they goal excessive and fall just a little quick. Don’t attempt to repair that sort of effort—have fun it!

Different occasions groups miss as a result of they simply hit a run of unhealthy luck for a handful of sprints. Once more, no have to intervene there.

However when unfinished work spills over from dash to dash, listed below are three issues you are able to do to assist.

Teams can break their rollover habit by making it visible, asking what if, and undercommiting temporarily.

1. Make Unfinished Dash Work Seen

One factor you are able to do straight away to assist cease recurring consumer story rollover is to make sure everybody notices that unfinished work exists.

When this dash ends, be aware the unfinished tales left within the dash backlog versus what number of have been 100% carried out. Even higher: look again on the prior sprints and depend these spillover tales too.

Deliver this info to the dash retrospective and ask the group members why they suppose unfinished work has develop into a sample for them. Stroll them by way of workout routines designed to uncover the basis explanation for an issue, akin to 5 Whys. Then invite them to debate choices and establish one factor they might attempt subsequent dash to alleviate that root trigger.

Don’t neglect to carry them accountable to attempting that concept (no matter it’s) throughout dash planning and because the dash progresses.

Free Sources to Assist Your Crew Cope with Unfinished Work

2. Curb Their Enthusiasm

Most frequently, incomplete work or unfinished tales are attributable to an overabundance of optimism. Folks plan every dash to be a best-case state of affairs and pull extra work from the product backlog than they will obtain primarily based on group capability.

If that sounds acquainted, in your subsequent dash planning assembly attempt asking questions like these:

  • What may go incorrect that might trigger us to overlook our objective (unplanned work, consumer story greater than anticipated, unexpected eventualities akin to vital bugs, integration points, and so forth)?
  • What has to go proper to realize this objective?

These questions might help uncover any dangerous assumptions a few story or about how simple the deliberate work can be. Consider it as a pre-mortem for the dash. (Pre-mortems are additionally helpful for figuring out mission dangers previous to a mission improvement effort.)

3. Drastically Below-commit

If elevated visibility and pointed questions don’t end in extra life like commitments, a Scrum Grasp might need to resort to drastically decreasing what the group brings into the dash backlog.

On the subsequent dash planning assembly, encourage your group to actually under-commit in relation to their group capability.

I’m not speaking about chopping the dash objective by some small quantity, like 10–20%. I’m saying to restrict group members to committing to solely 50% of what they consider they will full.

(They could have to separate consumer tales to do that. For assist with this, try SPIDR: 5 easy however highly effective methods to separate any consumer story.)

The group might push again on this. They’re used to filling up their dash and can be optimistic that they will get extra carried out than the gadgets they’ve chosen. Scrum Masters ought to maintain agency, reminding them that in the event that they run out of labor to do, they will all the time carry extra in./p>

(Scrum Masters will doubtless have to have a chat with the product proprietor previous to dash planning in order that they too will be ready to listen to that the group is bringing just a few gadgets into the dash.)

The objective in under-committing is to let everybody on the group (together with the product proprietor) really feel what it’s like so as to add a narrative reasonably than all the time needing to drop incomplete tales or carry spillover tales to a brand new dash.  After they do, they’ll doubtless wish to really feel it once more.

As soon as the group has felt the enjoyment of no dash spillover, Scrum Masters ought to encourage them to plan a bit extra into the following few iterations till they get near having to roll over incomplete tales once more. Incorporate the enthusiasm-curbing questions as wanted to stop over-committing.

Routine Spillover Can Be a Exhausting Behavior to Break

Agile groups have to carry out their finest whereas additionally permitting the group to create dependable plans. To try this, you desire a group that is aware of its capability and on the similar time isn’t afraid to attempt onerous issues. You additionally want a product proprietor and stakeholders who perceive that an bold group won’t accomplish its objective each iteration and that perceive the distinction between a dedication and a assure.

Key takeways: Spillover is a bad habit, caused by pressure. It makes teams less predictable and lowers morale. To break the habit, make incomplete stories visible, ask what if, and temporarily undercommit

Previous habits die onerous. Generally you need to take drastic motion to comprehend lasting outcomes.

Combating recurring dash spillover? The important thing to breaking the unfinished work behavior is steady enchancment—and that begins with higher retrospectives. Proper now you may get two model new on-demand video programs: Higher Retrospectives and Retrospectives Restore Information for the worth of 1. 

The supply expires at 9 p.m. Pacific on Thursday, April 17. Don’t let this chance spill over—entry each programs right here.

Final replace: April fifteenth, 2025